4 Gp ORB Terminology for Ops
Hello All,
In reviewing the 4 Group ORB for the period May 44 - Aug 45, I note that when Ops were not on for the day it was detailed as either, "No Ops Ordered", “No Ops Detailed" or "Ops Cancelled".
I was wondering if there was a distinction between the first two terms, with the possibility of:
"No Ops Ordered" being no Ops at all that day within Bomber Command; and,
"No Ops Detailed" meaning that Ops were on in Bomber Command, but none were detailed to 4 Group?
Or were the two terms completely interchangeable.
Mike
Last edited by anglin.mj; 16th July 2020 at 21:52.
Mike Anglin
Barrie, Canada
Bookmarks